Solution Architecture work stream
- Finnie Flores
-
- Hors Ligne
- Messages : 326
il y a 7 ans 9 mois #4135
par Finnie Flores
Réponse de Finnie Flores sur le sujet Solution Architecture work stream
Hi Igor,
Might be best to cancel the summer calls given vacation time.
Finnie
Might be best to cancel the summer calls given vacation time.
Finnie
Connexion ou Créer un compte pour participer à la conversation.
- Igor Sirkovich
-
- Hors Ligne
- Messages : 181
il y a 7 ans 9 mois #4134
par Igor Sirkovich
Réponse de Igor Sirkovich sur le sujet Solution Architecture work stream
Hello Everyone,
We had only two people on the last call (myself included) and I'm wondering if there is any interest to keep our summer meetings on or we should take time off, similar to some other FHIR streams, and resume our meetings in September.
Our currently planned meetings, which we might consider cancelling, are on July 27, August 10, August 24.
We had only two people on the last call (myself included) and I'm wondering if there is any interest to keep our summer meetings on or we should take time off, similar to some other FHIR streams, and resume our meetings in September.
Our currently planned meetings, which we might consider cancelling, are on July 27, August 10, August 24.
Connexion ou Créer un compte pour participer à la conversation.
- Igor Sirkovich
-
- Hors Ligne
- Messages : 181
il y a 7 ans 10 mois #4085
par Igor Sirkovich
Réponse de Igor Sirkovich sur le sujet Solution Architecture work stream
Please note the our call today is cancelled. Sorry for the late notice. Please join our next call on Friday, July 13. I've extended the repeating event to the end of this year - please
download the new iCal
file to update your calendar.
Connexion ou Créer un compte pour participer à la conversation.
- Igor Sirkovich
-
- Hors Ligne
- Messages : 181
il y a 7 ans 10 mois #4084
par Igor Sirkovich
Réponse de Igor Sirkovich sur le sujet Solution Architecture work stream
If a project has its own space on Simplifier, the extension can be added there, but it would have limited exposure.
My suggestion would be to repurpose our Canadian URIs registry to "Canadian URIs and Extensions" registry (utilizing both namingSystem and StructureDefinition resources). We can discuss this with Infoway at one of our next meetings.
My suggestion would be to repurpose our Canadian URIs registry to "Canadian URIs and Extensions" registry (utilizing both namingSystem and StructureDefinition resources). We can discuss this with Infoway at one of our next meetings.
Connexion ou Créer un compte pour participer à la conversation.
- Alexander Goel
-
- Hors Ligne
- Messages : 21
il y a 7 ans 10 mois #4080
par Alexander Goel
Réponse de Alexander Goel sur le sujet Solution Architecture work stream
My understanding was that they should be projects under the Canadian Registry
Connexion ou Créer un compte pour participer à la conversation.
- Shamil Nizamov
-
- Hors Ligne
- Messages : 70
il y a 7 ans 10 mois #4079
par Shamil Nizamov
Réponse de Shamil Nizamov sur le sujet Solution Architecture work stream
Well, extensions are obviously should be in Canadian registry on Simplifier, but where? Once we agreed that Simplifier is the tool by default for our registries I'm guessing that everyone has this in mind and we are not talking about other possible registries (e.g. ART-DECOR).
Connexion ou Créer un compte pour participer à la conversation.

